St. Peter’s Church, Preston

Year 2 – 2018

 

CAD Elevation 1 with people
CAD Elevation (Including People)

Final Design 1- Print A3 First 

  • Above is the Link to my Final Concept Board with all information of my design.

For this project we had to take an existing building that was given to us and re-use it based off of a brief. We had to base our design process off of creating it into a learning hub/library. This is the concept i came up with including plans and elevations.

My thought process and design is explained on my concept board.

A brief explanation of my design is i wanted to use all of the space up and wisely. So the bottom floor is the learning area with small and large teaching hubs, so classes could be taught and people could learn individually. The top floor is all about a space to display work and for shows. There is a building in the centre which i will say is the computer hub.

 

 

Leave a comment